Please use this identifier to cite or link to this item: http://repositorio.ufc.br/handle/riufc/84841
Type: TCC
Title: Análise comparativa entre custos unitários tabelados e apropriados em revestimentos de porcelanato
Title in English: Comparative analysis of tabulated and as-built unit costs in porcelain tile installations
Authors: Bessa, Gisele da Silva
Advisor: Barros Neto, José de Paula
Keywords in Brazilian Portuguese : Apropriação de índices;Custo unitário;Revestimento de porcelanato
Keywords in English : Cost index appropriation;Porcelain tile installation;Unit cost
Knowledge Areas - CNPq: CNPQ::ENGENHARIAS::ENGENHARIA CIVIL
Issue Date: 2026
Citation: BESSA, Gisele da Silva. Análise comparativa entre custos unitários tabelados e apropriados em revestimentos de porcelanato. 2026. Trabalho de Conclusão de Curso (Graduação em Engenharia Civil) – Centro de Tecnologia, Universidade Federal do Ceará, Fortaleza, 2026
Abstract in Brazilian Portuguese: O presente estudo apresenta uma análise comparativa entre os custos diretos unitários tabelados, extraídos das bases SINAPI e SEINFRA, e os custos apropriados em campo para a execução de revestimentos de piso em porcelanato. A pesquisa foi desenvolvida em uma obra comercial hospitalar na cidade de Fortaleza-CE, por meio de acompanhamento diário da produtividade da equipe, registro de consumo de materiais (porcelanato e argamassa colante), análise de notas fiscais e documentos. Foram avaliados três formatos de placas: 60×60 cm (3600 cm²), 120×60 cm (7200 cm²) e 120×120 cm (14400 cm²). Os resultados indicam variações significativas: para o formato 60×60 cm, os custos apropriados foram inferiores aos tabelados em média 17,79% (SINAPI) e 13,97% (SEINFRA), com maiores discrepâncias em áreas grandes (>10 m²), onde a diferença chegou a 23,40%; para 120×60 cm, as divergências foram em média 6,48% inferiores (SINAPI) e 3,87% superiores (SEINFRA), influenciadas pelo maior consumo de material e menor produtividade; já para 120×120 cm, os custos apropriados foram inferiores em 12,24% (SINAPI) e 14,59% (SEINFRA), refletindo maior eficiência em grandes formatos. Os índices de produtividade da mão de obra apropriados revelaram razões unitárias de produção maiores que aos tabelados pelo SINAPI, superando em até 290,10%, e maiores que os padronizados pela SEINFRA, ultrapassando até 361,18% o consumo. Já os consumos de materiais foram superiores, mas compensados por preços unitários negociados em obra. Conclui-se que as composições padronizadas subestimam os coeficientes técnicos e superestimam os custos reais, recomendando-se a apropriação local para maior precisão orçamentária e mitigação de riscos financeiros.
Abstract: This study presents a comparative analysis between tabulated direct unit costs, obtained from the SINAPI and SEINFRA databases, and field-appropriated costs for the execution of porcelain tile floor installations. The research was conducted in a commercial hospital construction project in the city of Fortaleza, Ceará, Brazil, through daily monitoring of crew productivity, recording of material consumption (porcelain tiles and adhesive mortar), and analysis of invoices and supporting documents. Three tile formats were evaluated: 60×60 cm (3,600 cm²), 120×60 cm (7,200 cm²), and 120×120 cm (14,400 cm²). The results indicate significant variations: for the 60×60 cm format, appropriated costs were, on average, 17.79% (SINAPI) and 13.97% (SEINFRA) lower than the tabulated costs, with greater discrepancies observed in large areas (>10 m²), where the difference reached 23.40%. For the 120×60 cm format, divergences averaged 6.48% lower than SINAPI values and 3.87% higher than SEINFRA values, influenced by higher material consumption and lower labor productivity. For the 120×120 cm format, appropriated costs were 12.24% (SINAPI) and 14.59% (SEINFRA) lower, reflecting greater efficiency in large-format installations. The appropriated labor productivity indices revealed unit production rates significantly higher than those tabulated by SINAPI, exceeding them by up to 290.10%, and higher than those standardized by SEINFRA, surpassing them by up to 361.18%. Material consumption was higher; however, this was offset by unit prices negotiated on-site. It is concluded that standardized cost compositions underestimate technical coefficients and overestimate actual costs, indicating that local cost appropriation is essential to improve budget accuracy and mitigate financial risks
URI: http://repositorio.ufc.br/handle/riufc/84841
Author's ORCID: https://orcid.org/0009-0005-3981-0443
Author's Lattes: https://lattes.cnpq.br/7372428719230700
Advisor's ORCID: https://orcid.org/0000-0001-5131-4593
Advisor's Lattes: https://lattes.cnpq.br/0148772831660645
Access Rights: Acesso Aberto
Appears in Collections:ENGENHARIA CIVIL - Monografias

Files in This Item:
File Description SizeFormat 
2026_tcc_gdasbessa.pdf7,25 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.