Use este identificador para citar ou linkar para este item: http://repositorio.ufc.br/handle/riufc/68788
Tipo: Artigo de Evento
Título: Land requirement scenarios of PV plants in Brazil
Autor(es): Carvalho, Paulo Cesar Marques de
Machado, Lívia de Araújo
Vitoriano, Camila Tavares
Fernández Ramírez, Luis Miguel
Palavras-chave: Energy scenario;PV sector development
Data do documento: 2018
Instituição/Editor/Publicador: International Conference on Renewable Energies and Power Quality
Citação: CARVALHO, P. C. M. et al. Land requirement scenarios of PV plants in Brazil. In: INTERNACIONAL CONFERENCE ON RENAWABLE ENERGIES AND POWER QUALITY, 2018, Salamanca. Anais... Salamanca: ICREPQ, 2018. p. 170-174.
Abstract: Wind and solar parks future development can be constrained by land requirements. Considering the expected rapid development of the photovoltaic (PV) sector in Brazil in the next years, we analyse in this paper the associated interactions between land requirement and possible impacts of the PV technology. Key data from selected PV plants in operation in Brazil are used as reference. Investigation is based on two electricity generation scenarios for the year 2050: 1) Base Scenario, developed according to governmental policies and current trends for the energy sector and 2) Energy Revolution Scenario, a projection developed by Greenpeace Brazil based on 100% renewable energy sources. Considering the 2050 - Base Scenario, PV installed capacity in Brazil is expected to require an area of 940 km2. Considering the 2050 - Energy Revolution Scenario, PV installed power in the country is expected to use an area of 2000 km2.
URI: http://www.repositorio.ufc.br/handle/riufc/68788
Aparece nas coleções:DEEL - Trabalhos apresentados em eventos

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
2018_eve_pcmcarvalho.pdf2,27 MBAdobe PDFVisualizar/Abrir


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.