Use este identificador para citar ou linkar para este item:
http://repositorio.ufc.br/handle/riufc/7133
Registro completo de metadados
Campo DC | Valor | Idioma |
---|---|---|
dc.contributor.author | Santos, Débora de Gois | - |
dc.contributor.author | Grosskopf, Joana | - |
dc.contributor.author | Souza, Andreza Menezes | - |
dc.contributor.author | Santos Neto, Antonio Lucrécio dos | - |
dc.contributor.author | Heineck, Luiz Fernando Mählmann | - |
dc.date.accessioned | 2014-01-14T16:48:12Z | - |
dc.date.available | 2014-01-14T16:48:12Z | - |
dc.date.issued | 2012 | - |
dc.identifier.citation | SANTOS, D. G. et al. Utilization of extra planning activities by construction companies in Sergipe, Brazil. In: CONFERENCE OF THE INTERNATIONAL GROUP FOR LEAN CONSTRUCTION, 20., 2012, San Diego. Anais… San Diego: CIGLC, 2012. | pt_BR |
dc.identifier.uri | http://www.repositorio.ufc.br/handle/riufc/7133 | - |
dc.description.abstract | The peculiar characteristics of civil construction associated with obstacles to the production process result in constraints that cause downtime for workers, often filled by non value-adding activities. This research work is directed to construction companies that are already using extra planning activities, informally, to remove these constraints. We wanted to identify the tacit knowledge level of construction managers working in Sergipe, Brazil, relative to extra planning activities. We applied a structured checklist for the following knowledge areas: Learning, Work Safety, Constructability, Lean Construction, Reengineering, Theory of Constraints, Quality and Productivity, and Planning and Production Control. Major findings of this research are related to those knowledge areas most applied by the respondents: Work Safety (92.31%), Reengineering (83.59%) and Lean Construction (77.62%). We could identify that the least widespread knowledge area was Theory of Constraints (67.31%). The authors are of the opinion that the informal implementation of these activities demonstrates the lack of dissemination of knowledge among managers. With this in mind, in future research, we will focus on facilitating the implementation of activities in these areas, and particularly in the area of Theory of Constraints, seeking to formalize it. | pt_BR |
dc.language.iso | en | pt_BR |
dc.publisher | Conference of the International Group for Lean Construction | pt_BR |
dc.subject | Construção enxuta | pt_BR |
dc.subject | Produção | pt_BR |
dc.title | Utilization of extra planning activities by construction companies in Sergipe, Brazil | pt_BR |
dc.type | Artigo de Evento | pt_BR |
Aparece nas coleções: | DECC - Trabalhos apresentados em eventos |
Arquivos associados a este item:
Arquivo | Descrição | Tamanho | Formato | |
---|---|---|---|---|
2012_eve_lfmheineck.pdf | 167,75 kB | Adobe PDF | Visualizar/Abrir |
Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.