Use este identificador para citar ou linkar para este item: http://repositorio.ufc.br/handle/riufc/68346
Registro completo de metadados
Campo DCValorIdioma
dc.contributor.authorAntonioli, Massimo Pinto-
dc.contributor.authorRodrigues, Carlos Diego-
dc.contributor.authorPrata, Bruno de Athayde-
dc.date.accessioned2022-09-16T19:21:08Z-
dc.date.available2022-09-16T19:21:08Z-
dc.date.issued2022-
dc.identifier.citationPRATA, B. A.; ANTONIOLI, M. P.; RODRIGUES, C. D. Minimizing total tardiness for the order scheduling problem with sequence-dependent setup times using hybrid matheuristics. International Journal of Industrial Engineering Computations, vol. 13, n. 2, p. 223-236, 2022. DOI: 10.5267/j.ijiec.2021.11.002pt_BR
dc.identifier.issn1923-2934-
dc.identifier.urihttp://www.repositorio.ufc.br/handle/riufc/68346-
dc.description.abstractThis paper aims at presenting a customer order scheduling environment in which the setup times are explicit and depend on the production sequence. The considered objective function is the total tardiness minimization. Since the variant under study is NP-hard, we propose a mixed-integer linear programming (MILP) model, an adaptation of the Order-Scheduling Modified Due-Date heuristic (OMDD) (referred to as Order-Scheduling Modified Due-Date Setup (OMMD-S)), an adaptation of the Framinan and Perez-Gonzalez heuristic (FP) (hereinafter referred to as Framinan and Perez-Gonzalez Setup (FP-S)), a matheuristic with Same Permutation in All Machines (SPAM), and the hybrid matheuristic SPAM-SJPO based on Job-Position Oscillation (JPO). The algorithms under comparison have been compared on an extensive benchmark of randomly generated test instances, considering two performance measures: Relative Deviation Index (RDI) and Success Rate (SR). For the small-size evaluated instances, the SPAM is the most efficient algorithm, presenting the better values of RDI and SR. For the large-size evaluated instances, the hybrid matheuristic SPAM-JPO and MILP model are the most efficient methods.pt_BR
dc.language.isoenpt_BR
dc.publisherInternational Journal of Industrial Engineering Computationspt_BR
dc.subjectProduction schedulingpt_BR
dc.subjectMatheuristicspt_BR
dc.subjectMixed-Integer linear programmingpt_BR
dc.titleMinimizing total tardiness for the order scheduling problem with sequence-dependent setup times using hybrid matheuristicspt_BR
dc.typeArtigo de Periódicopt_BR
Aparece nas coleções:DEPR - Artigos publicados em revistas científicas

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
2022_art_baprata.pdf625,04 kBAdobe PDFVisualizar/Abrir


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.