Please use this identifier to cite or link to this item: http://repositorio.ufc.br/handle/riufc/8144
Full metadata record
DC FieldValueLanguage
dc.contributor.authorVargas, Carlos Luciano Sant'Ana-
dc.contributor.authorHeineck, Luiz Fernando Mählmann-
dc.date.accessioned2014-05-30T14:59:00Z-
dc.date.available2014-05-30T14:59:00Z-
dc.date.issued1997-
dc.identifier.citationVARGAS, C. L. S.; HEINECK, L. F. M. Cálculo do balanço entre atividades repetitivas para uso em programas de gerenciamento de projetos. In: EENCONTRO NACIONAL DE ENGENHARIA DE PRODUÇÃO, 17., 1997, Gramado. Anais... Gramado: ENEGEP, 1997.pt_BR
dc.identifier.urihttp://www.repositorio.ufc.br/handle/riufc/8144-
dc.description.abstractLine of Balance Scheduling Techniques are being increasingly used by construction managers. However, software was still not specifically developed for this purpose; managers should rely on standard CPM software. This research work presents a methodology to calculate precedence between activities in a line of balance approach. Thus it is possible to use this software in a novel form, specially designed for repetitive type of construction.pt_BR
dc.language.isopt_BRpt_BR
dc.publisherENCONTRO NACIONAL DE ENGENHARIA DE PRODUÇÃOpt_BR
dc.subjectAdministração de projetospt_BR
dc.subjectAdministração de softwarespt_BR
dc.titleCálculo do balanço entre atividades repetitivas para uso em programas de gerenciamento de projetospt_BR
dc.typeArtigo de Eventopt_BR
Appears in Collections:DECC - Trabalhos apresentados em eventos

Files in This Item:
File Description SizeFormat 
1997_eve_lfmheineck_calculo.PDF57,04 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.