Please use this identifier to cite or link to this item:
http://repositorio.ufc.br/handle/riufc/8144Full metadata record
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | Vargas, Carlos Luciano Sant'Ana | - |
| dc.contributor.author | Heineck, Luiz Fernando Mählmann | - |
| dc.date.accessioned | 2014-05-30T14:59:00Z | - |
| dc.date.available | 2014-05-30T14:59:00Z | - |
| dc.date.issued | 1997 | - |
| dc.identifier.citation | VARGAS, C. L. S.; HEINECK, L. F. M. Cálculo do balanço entre atividades repetitivas para uso em programas de gerenciamento de projetos. In: EENCONTRO NACIONAL DE ENGENHARIA DE PRODUÇÃO, 17., 1997, Gramado. Anais... Gramado: ENEGEP, 1997. | pt_BR |
| dc.identifier.uri | http://www.repositorio.ufc.br/handle/riufc/8144 | - |
| dc.description.abstract | Line of Balance Scheduling Techniques are being increasingly used by construction managers. However, software was still not specifically developed for this purpose; managers should rely on standard CPM software. This research work presents a methodology to calculate precedence between activities in a line of balance approach. Thus it is possible to use this software in a novel form, specially designed for repetitive type of construction. | pt_BR |
| dc.language.iso | pt_BR | pt_BR |
| dc.publisher | ENCONTRO NACIONAL DE ENGENHARIA DE PRODUÇÃO | pt_BR |
| dc.subject | Administração de projetos | pt_BR |
| dc.subject | Administração de softwares | pt_BR |
| dc.title | Cálculo do balanço entre atividades repetitivas para uso em programas de gerenciamento de projetos | pt_BR |
| dc.type | Artigo de Evento | pt_BR |
| Appears in Collections: | DECC - Trabalhos apresentados em eventos | |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| 1997_eve_lfmheineck_calculo.PDF | 57,04 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.