Use este identificador para citar ou linkar para este item: http://repositorio.ufc.br/handle/riufc/71595
Registro completo de metadados
Campo DCValorIdioma
dc.contributor.authorAraújo, Kennedy Anderson Guimarães de-
dc.contributor.authorBonates, Tibérius de Oliveira e-
dc.contributor.authorPrata, Bruno de Athayde-
dc.date.accessioned2023-04-05T17:29:57Z-
dc.date.available2023-04-05T17:29:57Z-
dc.date.issued2021-
dc.identifier.citationARAÚJO, Kennedy Anderson Gumarães de; BONATES, Tibérius de Oliveira e; PRATA, Bruno de Athayde. The integrated cutting and packing heterogeneous precast beams multiperiod production planning problem. RAIRO - Operations Research, [s.l], v. 55, n. 4, p. 2491–2524, 2021.pt_BR
dc.identifier.issn2804-7303-
dc.identifier.otherhttps://doi.org/10.1051/ro/2021107-
dc.identifier.urihttp://www.repositorio.ufc.br/handle/riufc/71595-
dc.description.abstractWe introduce a novel variant of cutting production planning problems named Integrated Cutting and Packing Heterogeneous Precast Beams Multiperiod Production Planning (ICP-HPBMPP). We propose an integer linear programming model for the ICP-HPBMPP, as well as a lower bound for its optimal objective function value, which is empirically shown to be closer to the optimal solution value than the bound obtained from the linear relaxation of the model. We also propose a genetic algorithm approach for the ICP-HPBMPP as an alternative solution method. We discuss computational experiments and propose a parameterization for the genetic algorithm using D-optimal experimental design. We observe good performance of the exact approach when solving small-sized instances, although there are difficulties in finding optimal solutions for medium and large-sized problems, or even in finding feasible solutions for large instances. On the other hand, the genetic algorithm is shown to typically find good-quality solutions for large-sized instances within short computing times.pt_BR
dc.language.isoenpt_BR
dc.publisherRAIRO - Operations Researchpt_BR
dc.subjectPrecast beams - Modular constructionpt_BR
dc.subjectInteger linear programmingpt_BR
dc.subjectMetaheuristicspt_BR
dc.subjectVigas pré-moldadas - Construção modularpt_BR
dc.subjectProgramação linear inteirapt_BR
dc.titleThe integrated cutting and packing heterogeneous precast beams multiperiod production planning problempt_BR
dc.typeArtigo de Periódicopt_BR
Aparece nas coleções:DEME - Artigos publicados em revista científica

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
2021_art_baprata.pdf2,21 MBAdobe PDFVisualizar/Abrir


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.