Use este identificador para citar ou linkar para este item:
http://repositorio.ufc.br/handle/riufc/7143
Registro completo de metadados
Campo DC | Valor | Idioma |
---|---|---|
dc.contributor.author | Kemmer, Sérgio Luis | - |
dc.contributor.author | Heineck, Luiz Fernando Mählmann | - |
dc.contributor.author | Alves, Thaís da Costa Lago | - |
dc.date.accessioned | 2014-01-14T18:26:07Z | - |
dc.date.available | 2014-01-14T18:26:07Z | - |
dc.date.issued | 2008 | - |
dc.identifier.citation | KEMMER, S. L. ; HEINECK, L. F. M. ; ALVES, T. C. L. Using the line of balance for production system design. In: ENCONTRO NACIONAL DE ENGENHARIA DE PRODUÇÃO, 28., 2008, Rio de Janeiro. Anais... Rio de Janeiro: ENEGEP, 2008. | pt_BR |
dc.identifier.uri | http://www.repositorio.ufc.br/handle/riufc/7143 | - |
dc.description.abstract | The line of balance (LOB) is a tool for project planning and control that provides great visibility for the flows of work in a construction site. The LOB depicts information related to when, where and what activities are done at any time as well as activity batch size, pace, and buffers between different crews. Besides making work flows more transparent to those managing a project, this tool can serve as a means to simulate and discuss different alternatives and strategies to sequence activities in the long run. This paper presents a study carried out in a construction company in Fortaleza, Brazil in which the authors used the LOB in the initial planning phase of a high-rise residential project. Based on the information provided by different LOBs, representing different scenarios, the authors discussed with projects managers, superintendents, and crews the advantages and disadvantages of each scenario regarding the project’s lead time, activities cycle time, gang sizes, batch sizes, buffers, sequencing, interferences between crews, learning effect and productivity. The paper presents the project’s personnel views about the different scenarios and respective indicators, and discusses the implications of the group’s chosen scenario for the project as whole. The LOB was developed in spreadsheet software (Microsoft® Excel) and had a high rate of success as the project’s participants could easily understand the concepts used to develop each scenario, simulate, and evaluate the impacts they had on the project’s performance. Based on other papers’ conclusions about the topic, this paper aims at contributing to the discussion about production system design based on solid production indicators depicted through low-cost and low-level of abstraction tools such as the Line of Balance. | pt_BR |
dc.language.iso | en | pt_BR |
dc.publisher | Encontro Nacional de Engenharia de Produção | pt_BR |
dc.subject | Negociação | pt_BR |
dc.subject | Sistema de produção | pt_BR |
dc.title | Using the line of balance for production system design | pt_BR |
dc.type | Artigo de Evento | pt_BR |
Aparece nas coleções: | DECC - Trabalhos apresentados em eventos |
Arquivos associados a este item:
Arquivo | Descrição | Tamanho | Formato | |
---|---|---|---|---|
2008_eve_lfmheineck.pdf | 20,54 MB | Adobe PDF | Visualizar/Abrir |
Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.