Use este identificador para citar ou linkar para este item: http://repositorio.ufc.br/handle/riufc/8146
Tipo: Artigo de Evento
Título: Preplanning method for multistore building construction using line of balance
Autor(es): Mendes Júnior, Ricardo
Heineck, Luiz Fernando Mählmann
Palavras-chave: Construção civil - Planejamento;Controle de produção;Construção enxuta
Data do documento: 1998
Citação: MENDES JUNIOR, R. ; HEINECK, L. F. M. Preplanning method for multistore building construction using line of balance. In: ANNUAL CONFERENCE OF THE INTERNATIONAL GROUP FOR LEAN CONSTRUCTION, 6., 1998, Guarujá. Anais... Guarujá: IGLC, 1998.
Abstract: This paper reports one aspect of a research program devoted to the topic of production control in multi-story building construction. Preplanning using the line of balance technique attempts to solve planning problems by making production process clearer and simpler. A preplanning method is presented which needs little detailed information about productivities and work volumes and may be rapidly produced. The plan brings an overall view of the project by grouping the main activities that are highly interdependent. The concept on the best rhythm for each group of activities focus on the sequencie of work, continuity of labor team working and completeness rather than on pure schedule goals. Many characteristics of the method support lean construction concepts, such as waste elimination, variances minimization, flexible planning and scheduling sequencing. Using line of balance concepts also suggests some control tools which are being experimented on aplication cases and are briefly described.
URI: http://www.repositorio.ufc.br/handle/riufc/8146
Aparece nas coleções:DECC - Trabalhos apresentados em eventos

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
1998_eve_lfmheineck_preplanning.pdf29,22 kBAdobe PDFVisualizar/Abrir


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.